An Educators' Guide to Schoolwide Reform - Home
An Educators' Guide to Schoolwide Reform - Introduction
An Educators' Guide to Schoolwide Reform - Acknowledgments
An Educators' Guide to Schoolwide Reform - Overview
An Educators' Guide to Schoolwide Reform - 24 Approaches
An Educators' Guide to Schoolwide Reform - Catalogs & Reviews
An Educators' Guide to Schoolwide Reform - References
An Educators' Guide to Schoolwide Reform - Appendices
An Educators' Guide to Schoolwide Reform - Ordering Information
An Educators' Guide to Schoolwide Reform

APPENDIX F
SUMMARY OF FINDINGS ON COSTS


Costs for Sample of Sites Using Accelerated Schools

Site

First Year

Subsequent Years

 

Personnel

Materials

Staff
Development

Other

Personnel

Materials

Staff
Development

Other

Developer’s estimate 25% coach $13,000-$15,000         Costs decreased by four days of training
Site 1     $5,000 for teacher training Materials and personnel paid from the original operating budget     $4,000 for teacher training Material and personnel paid from the original operating budget
Site 2     $2,000 for staff development Materials and personnel paid from the original operating budget     $3,000 for staff development; staff development has increased in cost every year for 8 years,  

 

Costs for Sample of Sites Using America’s Choice

Site

First Year

Subsequent Years

 

Personnel

Materials

Staff
Development

Other

Personnel

Materials

Staff
Development

Other

Developer’s estimate for K-8 school of 500 Design coach; literacy and community outreach coordinators (possibly Title 1) $650 per class for Reference Exams; $1,000 per literacy coordinator for supplies Travel costs for staff development; release time for staff (20 days for literacy coordinator, 3 days for design coach, 1.5 days for community coordinator, 5 days for teacher conference) $65,000

tutoring expenses

Same as year 1

$65,000 for two additional years
Developer’s estimate for high school of 1,200 Design coach; school-to-career and community outreach coordi-nators (possibly Title 1); teacher release time $650 per class for Reference Exams; $1,000 per literacy coordinator for supplies Travel costs for staff development $95,000

Same as year 1

$95,000 for two additional years
Site 1 Design coach and community outreach coordinator (use people already employed by the district)   Staff release time and travel $65,000 fee to developer (includes all training and technical assistance) Design coach and community outreach coordinator (use people already employed by the district); added literacy coordinator this past year   Staff release time and travel $65,000 fee to developer (includes all training and technical assistance)

 

Costs for Sample of Sites Using America’s Choice

Site

First Year

Subsequent Years

 

Personnel

Materials

Staff
Development

Other

Personnel

Materials

Staff
Development

Other

Site 2 On-site coordinator (use current district employee; no additional salary requirements) School chooses not to purchase available materials   $65,000 fee to developer On-site coordinator (use current district employee; no additional salary requirements) School chooses not to purchase available materials   $65,000 fee to developer
Site 3 Designated

liaison

$1,000

Does not pay NCEE for materials $5,000 per year for training $65,000 all on grant funding $1,000 a year for liaison Does not pay NCEE for materials $5,000 per year for training $65,000 paid in grants

 

Costs for Sample of Sites Using ATLAS Communities

Site

First Year

Subsequent Years

 

Personnel

Materials

Staff
Development

Other

Personnel

Materials

Staff
Development

Other

Developer’s estimate Part-time pathway coordinator (for entire pathway) Workbooks for 70% of staff at $20/copy; supplementary materials Release time for 30% of staff to attend 3-4 day institute; weekly teacher study group; release time; travel costs and release time for 3-day prin-cipal institute; support for leadership institutes $50,000 (includes half-time site developer; 9-12 technical support visits; visit from another ATLAS site; materials for training, plan-ning, and evalu-ation; Web site, newsletter, registration for principal institute) Same as year 1 Same as year 1 Same as year 1 Year 2: $51,700

Year 3: $53,330

(includes same support and materials as first year; increase due to cost-of-living increases)

Site 1

3 schools

    $500-1,000 per visit for school staff to attend retreats and visit schools $60,000     $500-$1,000 per visit for school staff to attend retreats and visit schools Years 2-4: $60,000

Year 5: $20,000 (school began to do own professional development)

Site 2

5 schools

      Estimates about $50,000 a year in expenses; most of the money goes for extra time for teachers       $50,000 consistent price for three years
Site 3

5 schools

$200,000 for materials and joint planning activities Gradual reduction of funding after first two years

 

Costs for Sample of Sites Using Audrey Cohen College:
Purpose-Centered Education

Site

First Year

Subsequent Years

Personnel

Materials

Staff
Development

Other

Personnel

Materials

Staff
Development

Other

Developer’s estimate Staff resource specialist;

district liaison

$7,878 $36,685 plus release time, travel, lodging, and meals for Audrey Cohen College staff $7,000 (one time district licensing fee) Year 2-4 same as year 1 Year 2: $6,325

Year 3: $4,025

Year 4: Market price

Year 2: $23,345

Year 3: $22,425

Year 4: $10,000

 
Site 1   $7,000 $30,000-$40,000 plus release time, travel lodging, and meals for Audrey Cohen College staff Licensing fee waived for original pilot sites; everything is paid        

 

Costs for Sample of Sites Using Basic Schools Network

Site

First Year

Subsequent Years

 

Personnel

Materials

Staff
Development

Other

Personnel

Materials

Staff
Development

Other

Developer’s estimate $12,000 per year above current operating cost. The figure mostly includes training and staff release time.

Same as year 1

Site 1

Suburban, approximately 40% free lunch

    $10,000 grant used for staff release time, professional development, and visits to other sites  

Similar to year 1

Site 2

Urban

    Also received start-up grant; four planning meetings/year + other professional development and training  

Similar to year 1

Site 3

Urban

    Inservices, visit four times/year from mentor, conferences, summer institutes Additional staff release time for planning     Costs similar to year 1, but after a number of years, school staff become mentors rather than having mentors from Basic Schools Additional staff release time for planning
Site 4 No additional costs associated with becoming a Basic School No additional costs associated with becoming a Basic School

 

Costs for Sample of Sites Using Coalition of Essential Schools

Site

First Year

Subsequent Years

 

Personnel

Materials

Staff
Development

Other

Personnel

Materials

Staff
Development

Other

Developer’s estimate for a school of 500 students       No more than 10% of school budget without approach       Same as year 1
Site 1 No additional personnel; small school $4,000 $3,000 a year Small school;

2-3% of the school’s budget

No additional personnel $4,000 $3,000 a year Small school;

2-3%, of the school’s budget

Site 2 Not affiliated with the Center. Did not spend any additional funds outside the operating budget.
Site 3     $15,000 a year includes atten-dance at 2 Fall Forums 10% of the school’s budget     $15,000 a year; a consistent cost 10% of the school’s budget
Site 4 Additional release time and substitute time required $9,000 Option to send 1 or 2 people to fall conference; cost is $2,000 10% of the school’s budget Additional release and substitute time required $8,000 $2,000 plus cost of inservice days off for teachers 10% of the school’s budget
Site 5 Works within existing operat-ing budget $8,000-$9,000 for books $2,000 for travel and staff development Non-traditional program cost for less than 10% Works within existing operat-ing budget $8,000-$9,000 for books $2,000 for travel and staff development Non-traditional program cost for less than 10%

 

Costs for Sample of Sites Using Community for Learning

Site

First Year

Subsequent Years

 

Personnel

Materials

Staff
Development

Other

Personnel

Materials

Staff
Development

Other

Developer’s estimate for a school of 500 students Part-time district coordinator, full-time school facilitator   $30,000 for training and technical assistance; teacher release time (estimated 7.5 days for 25 teachers)   District coordinator; school facilitator   $15,000 and $5,000 in year 2 and year 3 respectively for training and technical assistance  
Site 1 School facilitator already em-ployed by the district   Less than $30,000   School facilitator already em-ployed by the district   Less than $30,000  
Site 2 School facilitator already em-ployed by the district $20,000 $30,000 (includes consultant to train teachers) School facilitator already em-ployed by the district $15,000 and $5,000 in year 2 and year 3 respectively (includes consultant)
Site 3 District facilitator (cost shared among schools in the district)   $30,000; 4 days release time for each teacher   District facilitator (cost shared among schools in the district)   $25,000 and $5,000 in year 2 and 3 respec-tively; 4 days release time for each teacher  

 

Costs for Sample of Sites Using Co-NECT

Site

First Year

Subsequent Years

 

Personnel

Materials

Staff
Development

Other

Personnel

Materials

Staff
Development

Other

Developer’s estimate for a school of 500 students   $500,000 hardware and software $7,500 Critical Friends (travel and hotel); teacher release time (75 days); $4,800 trainer (travel and expenses) $55,000 fee paid to the developer   Hardware and software upgrades, maintenance, services $6,500-7,500 Critical Friends (travel and hotel); teacher release time (65 days); $3,500 trainer (travel and expenses) $55,000 paid to the developer
Site 1   $600,000 hardware and software   $50,000 fee paid to the developer       $15,000 fee
Site 2 $30,000 part-time facilitator   $2,500 travel, Critical Friends; $480 substitutes (8 days) $55,000 fee $30,000 part-time facilitator   $2,500 travel, Critical Friends; $480 substitutes (8 days) $55,000 fee
Site 3 $30,000 part-time facilitator   $5,000 travel, Critical Friends $55,000 fee $30,000 part-time facilitator; technology coordinator   $5,000 travel, Critical Friends $55,000 fee

 

Costs for Sample of Sites Using Core Knowledge

Site

First Year

Subsequent Years

 

Personnel

Materials

Staff
Development

Other

Personnel

Materials

Staff
Development

Other

Developer’s estimate   $10,000 for classroom and library books, maps, etc.; $25/teacher for Core Knowledge Sequence; $50/teacher materials fee (for all workshops) $500 schoolwide fee for overview course, $3,375 for other work-shops; $5,000 technical assistance; teacher release time (estimated 5 days for 25 teachers) $15 membership fee   Additional costs for classroom and library books   $15 membership fee
Site 1       $58,000 first 2 years for materials and staff development; $1,500 for additional supplies $3,500 personnel $3,500 for materials   $7,500 additional supplies
Site 2   $6,000 $2,000 for 2 teachers to conference     $6,000 $2,000 teacher training  
Site 3   Exceeded operating budget prior to implementation; paying for materials problematic $2,000 conference     Paying for materials a continuous problem $2,000 conference  
Site 4     Send teacher to national conference $65,000 for materials and staff development     Send teachers to national conference  

 

Costs for Sample of Sites Using Different Ways of Knowing

Site

First Year

Subsequent Years

 

Personnel

Materials

Staff
Development

Other

Personnel

Materials

Staff
Development

Other

Developer’s estimate for a school of 500 students     Release time or stipend for professional development (7 days for 25 teachers); time for study groups and in-class coaching; additional leadership training; preservice from local college $35,000 fee; additional costs for curriculum planning time, independent evaluation (if desired), summer school support

Same as year 1

Site 1

(25 teachers)

  Curriculum modules ($500 per module) 3 days initial training and 3 days ongoing training $35,000 (roughly $1,250 per teacher for training)

Same as year 1

Site 2     Release time for teachers; cost of substitutes ($80 per day) $35,000

Same as year 1

 

Costs for Sample of Sites Using Different Ways of Knowing

Site

First Year

Subsequent Years

 

Personnel

Materials

Staff
Development

Other

Personnel

Materials

Staff
Development

Other

Site 3

(20 teachers)

      $11,000 (discounted from $16,000 because site hosts meetings for other schools); includes materials—model units and supporting materials, library books, audio and video tapes— plus 6-10 tech-nical assistance site visits       Year 2: $11,000

Year 3: less than $11,000

 

Costs for Sample of Sites Using Direct Instruction

Site

First Year

Subsequent Years

 

Personnel

Materials

Staff
Development

Other

Personnel

Materials

Staff
Development

Other

Developer’s estimate for a school of 500 students and 25 teachers Facilitator $62,500 $65,000 for training and technical assis-tance; release time (estimated 9.5 days for 25 teachers) Time to collect and send data to NIDI   $62,500 Years 2-5: $65,000/year for training and technical assis-tance; release time (estimated 4.5 days for 25 teachers) Time to collect and send data to NIDI
Site 1
(20 teachers)
    $1,000-$1,200 conference (20 teachers)   2 facilitators;, master teacher   $500-$600 conference

(10 teachers); $1,000-$1,200 out-of-state conference

(2 teachers); $1,500–$2,000 technical assis-tance visits

 
Site 2
(40 teachers)
        Facilitator consultant, 10 days per year @ $300-$500/visit   $7,000 $40,000 (including materials)
Site 3 DI resource teacher   4 days of training (entire staff) Close to $120,000 (including materials) DI resource teacher   4 days of training (entire staff) $45,000 (including materials)
Site 4   $45,000 $30,000 to developer (includes technical assistance)     Year 2: $25,000

Year 3: $35,000

(starting to use mathematics materials)

Year 2: $25,000 (reduced con-sultation hours)

Year 3: $16,000 (consultation down again)

 

 

Costs for Sample of Sites Using Expeditionary Learning
Outward Bound

Site

First Year

Subsequent Years

 

Personnel

Materials

Staff
Development

Other

Personnel

Materials

Staff
Development

Other

Developer’s estimate     $1,000-$1,200 per faculty member (travel, stipends, etc.) $53,750     $1,000 per faculty member (travel, stipends, etc.) Year 2: same as year 1

Year 3: 20% less than year 2

Year 4: 20% less than year 3

Year 5: 20% less than year 4

Site 1 Operating budget Operating budget $7,000 a year

for staff development

No additional cost Operating budget Operating budget $7,000 for staff development No additional cost
Site 2       $8,000 total       $8,000 total First year expects 20% drop per year
Site 3 $175,000 for 5 extra teachers; $35,000 per teacher Operating budget not a major expenditure $25,000 a year on staff development Additional planning time $1,050,000 for 30 additional teachers at $35,000 per teacher   $20,000 down 20 percent Has to budget additional planning time

 

Costs for Sample of Sites Using The Foxfire Fund

Site

First Year

Subsequent Years

 

Personnel

Materials

Staff
Development

Other

Personnel

Materials

Staff
Development

Other

Developer’s estimate     $50-600 for Taste of Foxfire presentations or workshops (average 9 hours, does not include travel);

$12,000 to $14,000 for whole-school for Level One courses (estimated 51 hours)

$40 for membership or $20 for journal subscription     $7,000-$9,000 for whole school for Level Two courses;

$300 per teacher for summer seminars

$40 for membership or $20 for journal subscription
Site 1     $100 per teacher (not schoolwide)       $100 per teacher  
Site 2     $12,000 total (schoolwide)          
Site 3     $400 per teacher (not schoolwide)       $400 per teacher  

 

Costs for Sample of Sites Using High Schools That Work

Site

First Year

Subsequent Years

 

Personnel

Materials

Staff
Development

Other

Personnel

Materials

Staff
Development

Other

Developer’s estimate     $15,000-$20,000 for other profes-sional develop-ment (e.g., planning time, curriculum development, stipends) $25,000-$35,000 (site development conference, staff and curriculum development, technical assistance, assessment package, team registration at conference, materials)     $15,000-$20,000 for other professional development (e.g., planning time, curriculum development, stipends) $25,000-$35,000 (technical assistance visit and follow-up, staff and curriculum development, assessment package, team registration at conference, materials)
Site 1       $33,000 for 3 years total; HSTW has not given site any money since the grant; sites have to apply to state and county when the money is gone       $11,000 a year total; run with mostly state and local funds.
Site 2       $25,000-$35,000 total       $25,000-$35,000
Site 3       $5,400 total     $1,500 workshop (6 teachers);

$2,200 conference (principal and assistant principal)

$5,400

 

Costs for Sample of Sites Using High/Scope K-3 Model

Site

First Year

Subsequent Years

 

Personnel

Materials

Staff
Development

Other

Personnel

Materials

Staff
Development

Other

Developer’s estimate for a school that contains 8 K-3 classrooms $4,967 estimated travel and subsistence cost for consultant $250 for work-shop materials; $1,333 curricu-lum guides and recordings for 8 classrooms $11,900 consulting fee for 5 site visits; $600 registration fees for 6 staff to attend Registry Conference Travel, release time, compensation, and other expenses for conferences and workshops

Similar to year 1

Site 1 – BIA school Computer tech Various materials Training for all staff 2-3 times/year "It’s costly, but it pays off"

Similar to year 1

Site 2   Materials were not noted as a large cost Training 2-3 times/year Costs reflect estimate given to site by the developer

Similar to year 1

 

Costs for Sample of Sites Using League of Professional Schools

Site

First Year

Subsequent Years

 

Personnel

Materials

Staff
Development

Other

Personnel

Materials

Staff
Development

Other

Developer’s estimate     36 person days,

additional costs for travel and expenses

$1,000 (membership fee)     24 person days;

additional costs for travel and expenses

$1,000 (membership fee)
Site 1     $4,000 (travel) $1,000 (membership fee)     $4,000 (travel) $1,000 (membership fee)
Site 2     $1,000 (travel) $1,000 (membership fee)     $1,000 (travel) $1,000 (membership fee)
Site 3     $1,500 (travel) $1,000 (membership fee)     $1,500 (travel) $1,000 (membership fee)

 

Costs for Sample of Sites Using Modern Red Schoolhouse

Site

First Year

Subsequent Years

 

Personnel

Materials

Staff
Development

Other

Personnel

Materials

Staff
Development

Other

Developer’s estimate for a school of 500 students   Costs for technology ranging from $8,333 to $100,000 Teacher release time (estimated 25 teachers for 5 days and groups of 8 teachers for 25 days) $60,000 to $80,000 paid to developer

Similar to year 1

Site 1 Full-time curriculum coordinator $24,000

(3 schools)

Additional staff development

< $24,000

  Full-time curriculum coordinator $72,000

(3 schools for

3 years)

Additional $72,000

(3 schools for 3 years)

County school system in the first year of a 3-year grant
Site 2 No additional staff; paid for by grant $20,000

(2 schools for

3 years)

(10-15 teachers,

$100 a day);

$1,500 total for conference

$70,000 for the whole grant

(2 schools)

No additional staff $20,000 a year

(2 schools for

3 years)

$1,000 for 10 teachers to attend a 2-day conference $70,000 for 2 schools over 3 years
Site 3 No additional costs $5,000 $25,000 for staff development $25,000 No additional costs $10,000 $25,000 for staff development $25,000

 

Costs for Sample of Sites Using Onward to Excellence

Site

First Year

Subsequent Years

 

Personnel

Materials

Staff
Development

Other

Personnel

Materials

Staff
Development

Other

Developer’s estimate .25 FTE facilitator   $7,500 training, release time (13 days for 4-member leadership team, 4 days for 3 4-member study groups, 3 days for entire staff) Travel for OTE training to visit school (7 $500 visits in the first year) 25% FTE facilitator   $7,500 (training) 6-12 days release time Travel for OTE trainer to visit school (2 visits in the second year)
Site 1     $1,500 (teacher release time, expenses) $10,500     $1,500 (teacher release time, expenses) $10,500
Site 2     $700 (teacher release time), 7-10 times a year       $700 (teacher release time), 7-10 times a year  
Site 3       Less than $10,500       Less than $10,500

 

Costs for Sample of Sites Using Paideia

Site

First Year

Subsequent Years

 

Personnel

Materials

Staff
Development

Other

Personnel

Materials

Staff
Development

Other

Developer’s estimate for a school of 500 students School facilitator   Teacher release time (4 days for all teachers, 25-35 days tech-nical assistance) $50,000 to $70,000 in year 1 for implementation of the Paideia seminar, including training materials, follow-up visits, and other services School facilitator   Teacher release time $40,000 to $50,000 in year 2 for implementation of coaching;

$30,000 to $40,000 for assessment

Site 1 Shared Leadership and Seminar Planning teams (made up of school faculty)   Received implementation grant that funded staff development for first 3 years   Shared Leadership and Seminar Plan-ning teams (made up of school faculty)   New staff now trained by current staff (no development funds) Cost analysis showed the costs of operating this school to be no more/less than other schools in the district (including non-Paideia schools)
Site 2 School facilitator   Teachers sent to professional development opportunities   School facilitator   Teachers sent to professional development opportunities  
Site 3       $50,000 total for first year of implementation; first-year evaluation is one of the most expensive costs       $35,000 a year after the first year; West coast schools pay more because of the professional devel-opment and tech-nical assistance costs.

 

Costs for Sample of Sites Using Roots and Wings

Site

First Year

Subsequent Years

 

Personnel

Materials

Staff
Development

Other

Personnel

Materials

Staff
Development

Other

Developer’s estimate for a school of 500 students Full-time facilitator and tutors     $70,000 total plus additional costs for family support team Same as year 1     $70,000 per year for years 2 and 3
Site 1 $107,238 $82,500 $14,000 Release time

$16,000

$107,238 $15,000 $7,000 Release time

$4,000

Site 2 $210,000 $30,000 $30,000   $210,000 $30,000 $25,000  
Site 3 1 facilitator,

3 tutors

Unlimited 5 to 5 ½ days   2 Facilitators,

6 Tutors

Unlimited 3 days for incoming personnel, 4 to 5½ days for all  
Site 4 4-5 paraprofes-sionals for tutors, facilitator, parent liaison $100,000 reading $100,000 reading $40,000

MathWings

(including materials and staff development)

4-5 paraprofes-sionals for tutors, facilitator, parent liaison $10,000 reading Varies $27,000 MathWings (including materials and staff development)

 

Costs for Sample of Sites Using School Development Program

Site

First Year

Subsequent Years

 

Personnel

Materials

Staff
Development

Other

Personnel

Materials

Staff
Development

Other

Developer’s estimate Quarter-time facilitator   $10,000 (5 staff, 2 1-week workshops); $1,000 principals’ aca-demy; additional costs for teacher release time (estimated 10 days for 5 staff and 1 additional day for princi-pal); travel expenses $5,000 per district;

$2,000 for technical assistance site visits

Same as year 1   $5,000 (5 teachers, 1-week workshop) Same as year 1
Site 1     $3,000       Same as year 1  
Site 2       $20,000     $5,000 (3-5 staff members) $3,000
Site 3
46 SDP schools
    na (schools pay separately) $5,000 fee for district     Same as year 1 Same as year 1

 

Costs for Sample of Sites Using Success for All

Site

First Year

Subsequent Years

 

Personnel

Materials

Staff
Development

Other

Personnel

Materials

Staff
Development

Other

Developer’s estimate for a school of 500 students Full-time facilitator, tutors     $70,000 total plus additional costs for family support team Same as year 1     $30,000 total year 2; $20,000 total year 3 plus additional costs for family support team
Site 1 Full-time facilitator, tutors Various supplies Three visits from SFA staff, technical assistance   Full-time facilitator, tutors Replacement of consumable supplies Two visits in year 2, one visit in year 3  
Site 2

600 to 620 students, 90-95% free/ reduced lunch; 55% LEP

Facilitator shared between several schools, other additional staff Various supplies; have used Spanish-language materials Two trainers provided 3 2-day visits and trained every teacher;

Bilingual consul-tants; share training with other schools

  Costs are less than in first year because of less cost for materials and less training. However, the facilitator was unable to give an exact estimate of cost decrease.
Site 3 Full-time facilitator, tutors Various supplies Three visits from SFA staff, technical assistance $86,000 total for three years (this is the first year)       The school has been told to expect a large decrease (as much as half). Consistent cost on process and development.
  $35,000 extra needed for tutors     $60,000 for materials and initial staff development $35,000 extra needed for tutors     $38,000 for total cost year of the program. Expect $30,000 total for the 4th year.

 

Costs for Sample of Sites Using Talent Development High School

Site

First Year 2

Subsequent Years

 

Personnel

Materials

Staff
Development

Other

Personnel

Materials

Staff
Development

Other

Developer’s estimate for a school of 2,0001 students $30,000 (two part-time facilitators) $1,000 guide books;

$3,600 interest inventories

$10,000 for 10 days consulting;

teacher release time (4 hours/ mostly for 25 teachers); $47,130 summer training (include-ing stipends)

$2,500 brochures;

$5,000 facility adaptation;

$2,000-$5,000 discretionary funds

$60,000 (two part-time facilitators) $1,600 interest inventories $400 leadership meeting; attendance workshop;

teacher release time (250-500 days total)

$12,000 technical assistance on curricula;

$2,500 brochures expenses for twilight and Saturday schools;

$5,000-$10,000 discretionary funds

Site 1 $47,000 per teacher, 3 full-time teachers and 3 part-time teachers   $20,000 for professional development   $47,000 per teacher, 3 full-time teachers and 3 part-time teachers   $20,000 total for professional development $150,000 over 3 years on con-struction to make class size smaller
Site 2 No additional staff; worked within operating budget $4,600 on materials $10,000 for professional development   Work within operating budget Work within operating budget $10,000 for professional development  

 

Costs for Sample of Sites Using Urban Learning Centers

Site

First Year

Subsequent Years

 

Personnel

Materials

Staff
Development

Other

Personnel

Materials

Staff
Development

Other

Developer’s estimate   Additional costs for technology; Product Design Center; other materials Additional costs for professional development and planning (20 days for 50-75 teachers) $75,000 (training, technical assistance, materials, part-time coordinator) Full-time coordinator (salary) Additional costs for technology; Product Design Center; other materials Additional costs for professional development and planning (20 days for 50-75 teachers) $75,000 (training, technical assistance, materials, part-time coordinator)
Site 1

(2,000 students, 87 teachers)

      $27,000

(technology, other materials, training, technical assistance)

      $27,000 (technology, other materials, training)
Site 2

(3,220 students, 139 teachers)

      First two years were free because approach was being developed at the school.       $90,000 (coordinator for health center, parent and community involvement coordinator, materials, training)
Site 3       $27,000 (materials, training, travel costs, release time)